Department of Public Works

Engineering Department

The Engineering Department is responsible for the budgeting, planning, designing and managing of street, storm water and other infrastructure projects. The department is also responsible for Right of Way and  Storm water permitting activities.

Permits

To apply for a Right of Way Permit or a Storm Water Permit, please use the below application and select the “Right of Way” or “Storm Water” under the Type of Permit Being Requested drop down menu.

Street Cut or Right of Way Permit Requirements

Apply and Pay for Permits

All Right of Way permit applications shall require a three (3) year maintenance bond in the sum of $10,000 for a specific location or a three (3) year blanket maintenance bond in the sum of no less than $100,000 for all locations per calendar year.

Maintenance Bond

Roadway Standards

Standard Drawings

Stormwater Standards 

Storm water design shall follow City of Indianapolis Stormwater Design and Construction Specifications available by clicking here.

Stormwater Credit Manual

 

Title VI and ADA

Public Education